SGS Building
| Client: | LPA Sacramento (Butte College) |
| Timing: | 2007 to Present |
| Const-Cost: | $13 Million |
| Team: | NorthStar Engineering (Civil) LPA Sacramento (Architect) Buhler & Buhler (Structural) Engineering Enterprise (Electrical) Turley Mechanical (Mech & Plumb) Angus Hammer (Tele Com) |
| Reference: | Mike Miller - Dir. Butte College Facilities (530) 895-2381 3536 Butte Campus Dr. Oroville, CA 95965 |
![]() This project began with a complete site topographic survey including tying existing underground utilities and all surrounding facilities. The design process (run by LPA Saramento) proceeded through various programming stages and was further developed in the Schematic Design Prints. These were refined and modified with district comments to create the Design Development plans. Complete submittal to DSA and another round of input from the college district and cross checking from the other sub consultants and architect lead to the final Construction Documents. NorthStar Engineering’s services included both bid and construction support keeping consistency and ensuring the contractor met district construction standards and conformed to the specifications. |
|
