Washington-Montgomery Roundabout
| Client: | City of Oroville |
| Timing: | Design 06-07 Construction 2008 |
| Design Fees: | $260,000 |
| Team: | NorthStar Engineering (Civil & Prime) Gallaway Consulting (Historic Prop. Survey) RTE Engineering (Traffic Analysis) Bender Rosenthal (ROW acquisition) Land Image (3D-Graphics & Landscape) Curry Group CGI (Geotechnical Borings) |
| Reference: | Richard Walls City Project Manager (530) 538-2507 1735 Montgomery St, Oroville CA |
![]() NorthStar Engineering completed roadway plans including sewer replacement, storm drainage modifications, decorative retaining walls, enhanced lighting, and full roadway and roundabout improvements. This site was particularly difficult in relation to ADA accessibility due to the extreme >5% slopes on two of the approaching legs of the intersection. NorthStar worked with city staff to either meet ADA design requirements or file formal non-compliance deviations at all pedestrian locations. Curry Group (CGI) provided “R” value testing that was used to determine minimum roadway sections for the roundabout. Despite on-going public opposition the roundabout is becoming accepted and liked by residents as both a key visual upgrade and for its traffic moving abilities. To aid in the public understanding of the traffic rules and how to negotiate the roundabout the City of Oroville asked Land Image to assist in providing additional public information material comprising a how-to-drive roundabouts brochure. Team coordination proved to be a vital part of this projects success with NorthStar Engineering, Land Image and the City of Oroville staff working closely to meet all of the design objectives and keep the project on schedule. Despite minor delays when the council determined not to acquire the needed Right of Way and continue with construction (a decision that was later reversed) the project was constructed on the original schedule as set by the City of Oroville. This project is a key example of how NorthStar Engineering can work with a talented design team and dedicated City staff to deliver an exceptional project, on-time and on budget. |
|